Works on the main road M4 Valjevo-Loznica, section from the road R268 for Tršić to the road R211 for Krupanj (Krst), from km 534+527.02 to km 538+040.43 Construction works are in progress. Reconstruction and the extension of the existing main road with the reparation of two landslides, reinforcement of the road’s construction by means of building new and reparation and extension of existing passing lanes, and by means of building retaining and paneled walls with undisturbed traffic flow during the execution of the works. Investor: Road Construction Company “Beograd”, Belgrade |
|
|
|
![]() |
Execution of a portion of building works on the reconstruction of a part of the Avala’s tower in Belgrade. Construction works are in progress. Construction of new roads and car parks under the Avala’s tower, together with the land restructuring of the surrounding area. Investor: “Ratko Mitrović Dedinje” Belgrade |
|
|
|
|
|
Reparation of the street – connection between Tamnavska Street - II phase and Miloša Obrenovića in Obrenovac Year: 2006. Beginning of the works on the construction of the roundabout road around Obrenovac, from the gas station “Jugopetrol” to the bridge over the Kolubara. Execution of ground and asphalting works. During the year of 2008, the works of construction and paving of the sidewalks were continued. Investor: The Public Enterprise for the Construction of Obrenovac |
|
|
|
![]() |
Land restructuring of the central square in Ruma Year: 2007. Land restructuring of the existing square with the construction of a new fountain, ground leveling, placement of concrete boards and reconstruction of water supply and sewerage system. Investor: The Public Enterprise for the Construction of Ruma |
|
|
|
![]() |
Reconstruction of the square “Wreath of freedom” in Aranđelovac Year: 2007. Land restructuring of the existing square with the removal of the existing asphalt and trees, and with the construction of a new fountain, with all mounting and concrete works. As a part of the reconstruction, the replacement of the existing sewerage system was done as well, and the whole square was paved with granite tiles. Investor: The Public Enterprise for the Construction of Aranđelovac |
|
|
|
![]() |
Execution of the works in King Aleksandar’s Street in Obrenovac Year: 2007. Reconstruction of the existing street with ground works, building of a new construction of the road and sidewalks and placement of the new sewerage system. Investor: The Public Enterprise for the Construction of Obrenovac |
|
|
|
![]() |
Execution of construction works on the extension of the building for the production of foodstuff in Kolari
Year: 2007. |
|
|
|
![]() |
Execution of construction works on the residential buildings in the residential area Bele Vode in Belgrade
Year: 2007. |
|
|
|
![]() |
Execution of asphalting works on the bridge over the canal Danube-Tisa-Danube (DTD) on the road Jasenovo - Duplja - Grebenac Year: 2007. Asphalting works on the bridge over the canal Danube-Tisa-Danube (DTD). As a subcontractor of the company “INTER-MOST”, it carried out asphalting works on several other bridges as well: the bridge over the Ibar in Kraljevo, the bridge over the river Moravica, the bridge on the road L-410 near Prigrevica. Investor: “INTER-MOST” joint stock company, Belgrade |
|
|
|
![]() |
Asphalting works in front of "CASH & CARRY - RODIĆ" in Zemun Year: 2008. Asphalting works (BNS, AB) on the access road from the Highway to the new building, asphalting of the local roads on the construction site and asphalting of the car park in front of the building. Investor: “ELITA – COOP” Belgrade |
|
|
|
![]() |
Reparation of the road construction on the “A” platform and reparation of the roads under the air bridges on the airport “Nikola Tesla” in Belgrade Year: 2008. Removal of the parts and damages on the existing “A” platform which were replaced with the construction of reinforced concrete, as well as the repair work on the existing holes with the use of eksmal and by means of sealing the cracks on the platform and the road. Investor: Road Construction Company “Beograd”, Belgrade |
|
|
|
![]() |
Coating of the existing roads with the asphalt cover layer without the participation of citizens for the portion number 4 (roads in local communities Ušće, Skela, Ratari and Krtinska) Year: 2008. Extension of the existing roads, reinforcement of the construction with a new layer of road metal and asphalting of the roads on the territory of the local communities. Investor: The Public Enterprise for the Construction of Obrenovac |
|
|
|
![]() |
Construction – coating of the roads in local communities with the asphalt cover layer on the territory of the Municipality of Obrenovac (joint resources with the local communities) Year: 2008. Extension and elongation of the existing roads, reinforcement of the construction with a new layer of road metal and asphalting of the roads on the territory of local communities of the Municipality of Obrenovac. Investor: The Public Enterprise for the Construction of Obrenovac |
|
|
|
![]() |
Execution of asphalting works during the construction of roads and external land restructuring of the shopping mall “Pevec” Year: 2008. Execution of asphalting works on the roads and car parks. Investor: “ELITA – COOP” Belgrade |